BEGIN:VCALENDAR
VERSION:2.0
PRODID:-//The Engineering &amp; Manufacturing Network - ECPv6.15.14//NONSGML v1.0//EN
CALSCALE:GREGORIAN
METHOD:PUBLISH
X-WR-CALNAME:The Engineering &amp; Manufacturing Network
X-ORIGINAL-URL:https://emn.org.uk
X-WR-CALDESC:Events for The Engineering &amp; Manufacturing Network
REFRESH-INTERVAL;VALUE=DURATION:PT1H
X-Robots-Tag:noindex
X-PUBLISHED-TTL:PT1H
BEGIN:VTIMEZONE
TZID:UTC
BEGIN:STANDARD
TZOFFSETFROM:+0000
TZOFFSETTO:+0000
TZNAME:UTC
DTSTART:20210101T000000
END:STANDARD
END:VTIMEZONE
BEGIN:VEVENT
DTSTART;TZID=UTC:20220503T120000
DTEND;TZID=UTC:20220503T140000
DTSTAMP:20260406T164731
CREATED:20220303T095626Z
LAST-MODIFIED:20220315T122732Z
UID:3511-1651579200-1651586400@emn.org.uk
SUMMARY:Member to Member: Lunch and Learn - Product launches – thinking outside the box
DESCRIPTION:A major product launch can be a key part of a company’s business strategy – and there are many ways marketing can support this. As the Coronavirus pandemic has impacted on face to face events and international travel over the last two years\, many organisations have looked at more innovative ways of launching their products… and are embracing new digital tools and platforms.  \nThe session will cover:  \n Guidance on creating a marketing strategy and product launch plan  \n Advice on putting the building blocks in place for a successful product launch  \n Examples of marketing tools and tactics to support a product launch\, from social media and PR to animations and VR  \n How to measure the success of a product launch  \nThe session will be hosted by Komatsu UK at the company’s site in Birtley. Gemma Brotherton\, Komatsu Way and PR co-ordinator at Komatsu UK\, will give delegates an insight into the launch of the K100 quick boom change system\, which is used in demolition applications\, and demonstrate how the company overcame a lack of face to face events – such as international construction expos – by embracing new digital marketing techniques.  \nThe event will also include a tour of the Komatsu UK factory – and is a fantastic opportunity to experience one of the North East’s most high- profile manufacturing operations.  \n12:00pm – Arrival\, lunch and networking  \n12:30pm – Welcome from EMN and Horizon Works  \n12:40pm – Presentations from Horizon Works and Komatsu UK  \n13.20pm – Site tour of Komatsu UK  \nThe event is limited to 30 participants. \nhttps://www.eventbrite.co.uk/e/lunch-and-learn-product-launches-thinking-outside-the-box-tickets-290278329297
URL:https://emn.org.uk/oldevent/member-to-member-lunch-and-learn-product-launches-thinking-outside-the-box/
LOCATION:Durham Rd\, Chester-le-Street\, England\, DH3 2QX
CATEGORIES:EMN & Partner Events
ATTACH;FMTTYPE=image/jpeg:https://emn.org.uk/wp-content/uploads/2022/03/EMN-Lunch-and-Learn_Marketing-internationally.jpg
ORGANIZER;CN="Horizon Works":MAILTO:hello@horizonworks.co.uk
END:VEVENT
BEGIN:VEVENT
DTSTART;TZID=UTC:20220504T090000
DTEND;TZID=UTC:20220504T170000
DTSTAMP:20260406T164731
CREATED:20220426T094021Z
LAST-MODIFIED:20220426T094021Z
UID:3743-1651654800-1651683600@emn.org.uk
SUMMARY:Promoted Event: Showcase Tees Valley - May 4th 2022 - Riverside Stadium\, Middlesbrough
DESCRIPTION:As part of the Tees Valley Business Challenge\, we will be holding a free to attend large-scale supply chain event on May 4th 2022 at Middlesbrough Football Club (summary info below). \nWe are anticipating over 250 SME visitors on the day and we would delighted if you could attend the event. \nShowcase Tees Valley \n\nSpeakers from blue-chip organisations including BP\, Hitachi\, Lockheed Martin Space\, HS2\, RWE and Equinor\, who are engaged on major projects\, will highlight their plans.\n\n\nA key aim of the Supply Chain strand to link SMEs with large organisations which may have current and future supply chain needs.\n\n\nThe event at the Riverside Stadium on 4th May will act more as a conference rather than exhibition.\n\n\nThis one-day event will be covering several industry sectors with an interest in local capacity and capability.\n\n\nThe event is a great opportunity for local companies to network\, arrange one to one discussion\, outline the great products and services which they offer and understand how they could be part of the respective supply chains.\n\n\nThere will be opportunity for delegates to meet with locally based business support organisations and understand assistance which they could access.\n\nEvent registration link is: \nhttps://www.eventbrite.co.uk/e/showcase-tees-valley-2022-registration-301375922497
URL:https://emn.org.uk/oldevent/promoted-event-showcase-tees-valley-may-4th-2022-riverside-stadium-middlesbrough/
LOCATION:Riverside Stadium TS3 6RS
CATEGORIES:Affiliate Member Events
END:VEVENT
BEGIN:VEVENT
DTSTART;TZID=UTC:20220505T100000
DTEND;TZID=UTC:20220505T113000
DTSTAMP:20260406T164731
CREATED:20220426T090239Z
LAST-MODIFIED:20220426T090703Z
UID:3738-1651744800-1651750200@emn.org.uk
SUMMARY:AFFILIATE EVENT: RECRUITMENT & RETENTION
DESCRIPTION:
URL:https://emn.org.uk/oldevent/affiliate-event-recruitment-retention/
CATEGORIES:Affiliate Member Events
END:VEVENT
BEGIN:VEVENT
DTSTART;TZID=UTC:20220512T083000
DTEND;TZID=UTC:20220512T220000
DTSTAMP:20260406T164731
CREATED:20220505T091711Z
LAST-MODIFIED:20220505T091711Z
UID:3767-1652344200-1652392800@emn.org.uk
SUMMARY:Promoted Event: The impact of inflation on North East SME's
DESCRIPTION:https://www.eventbrite.co.uk/e/the-impact-of-inflation-on-north-east-smes-tickets-313665721617 \n\n\n\n\nDate and time\n\nThu\, 12 May 2022 \n08:30 – 10:00 BST \n\nLocation\n\nNewcastle Falcons \nBrunton Road \nNewcastle upon Tyne \nNE13 8AF \n\n\nThe impact of inflation on North East SME’s\, with guest speaker Mauricio Armellini from the Bank of England.\n\n\n\n\n\nAbout this event\n\n\nThe rising cost of living in the UK is now squeezing small and medium-sized businesses\, with many feeling the impact of higher energy prices plus rising staff costs on their bottom line.\nThe Bank of England has projected inflation will peak at over 8% this year and real household incomes will fall by an average of £1\,000 by the end of 2022. \n8.30am – Registration & Breakfast \n9.00am – Presentation Starts \n10.00am – Questions & Close \nWith Guest Speaker – Mauricio Armellini\, Bank of England | Agent for the North East \nOur Managing Partner\, Andrew Moorby will be joined by Mauricio to discuss what SMEs can do to brace themselves against the rising cost of living. \nThis 1-hour seminar will cover The Bank of England’s outlook for the UK economy\, as well as its projections for economic growth\, inflation and unemployment.
URL:https://emn.org.uk/oldevent/promoted-event-the-impact-of-inflation-on-north-east-smes/
LOCATION:Newcastle Falcons\, Newcastle Falcons\, Kingston Park Brunton Road\, Newcastle Upon Tyne\, Durham\, NE13 8AF\, United Kingdom
CATEGORIES:Affiliate Member Events
END:VEVENT
BEGIN:VEVENT
DTSTART;TZID=UTC:20220517T100000
DTEND;TZID=UTC:20220517T150000
DTSTAMP:20260406T164731
CREATED:20220407T110530Z
LAST-MODIFIED:20220407T110530Z
UID:3720-1652781600-1652799600@emn.org.uk
SUMMARY:Promoted Event: Drax and Worley Announce Bioenergy with Carbon Capture & Storage (BECCS) Supplier Roadshow
DESCRIPTION:https://www.eventbrite.co.uk/e/drax-and-worley-beccs-roadshow-humberside-tickets-297927708797\nSupplier registration and portal now open\nFollowing on from a successful introductory webinar in September 2021\, which can be viewed here\, renewable energy company Drax is continuing a programme of supplier engagement to help deliver its pioneering bioenergy with carbon capture and storage (BECCS) project in the Humber. BECCS is a climate-saving negative emissions technology that will be critical to helping the UK reach net zero while putting the Humber region at the heart of a global green economy. \nDrax are inviting new and prospective suppliers to attend one of two roadshow events across the Humber and Teesside to learn more about how to get involved with BECCS at Drax. The roadshow events will be co-hosted by Drax and our FEED partners\, Worley. Suppliers hoping to work on the project will have the opportunity to discuss detailed plans for construction of BECCS at Drax with Drax and Worley engineers and submit a formal expression of interest for the project via the supplier registration portal\, Requis. Click here \n\n\nDrax and Worley launch supplier registration portal\nNew and existing suppliers interested in working on the BECCS at Drax project can now submit a formal expression of interest for the project via the supplier registration portal\, Requis. Click here \n\n\nFAQs\nWhat is Bioenergy with carbon capture and storage (BECCS)?\nBioenergy with carbon capture and storage (BECCS) is a technology that has been developed to remove carbon dioxide (CO2) from the atmosphere. At Drax Power Station we already use biomass sourced from sustainably managed forests to generate electricity\, and we now plan to install BECCS technology to capture the CO2 emitted as part of that energy generation. The process of electricity generation becomes carbon negative\, as more CO2 has been removed from the atmosphere than has been added. The captured CO2 will be transported via pipeline and stored permanently under the seabed of the North Sea by our partners in the East Coast Cluster. \n  \n What’s the latest update on the BECCs at Drax Programme?\nThe BECCS at Drax project is one of the most advanced CCS projects under development in the UK and is an anchor project in the East Coast Cluster. Recent developments include: \n\nFirst CCS project in the UK to announce a capture technology licence agreement with Mitsubishi Heavy Industries in June 2021​\n\n\nWorley selected as EPC partner in December 2021​\n\n\nFEED study commenced January 2022\n\n\nDevelopment Consent Order application initiated\, with final submission expected in Q2 2022\n\n  \nI’ve previously signed up through the NOF database\, do I need to register again?\nIf you are a supplier hoping to work on the BECCS at Drax project and have registered for the Drax BECCS supplier database via NOF\, you must also submit a formal expression of interest for the project via supplier registration portal\, Requis. Click here \n\n\nLet’s talk\nLewis Abbott\, Events Administrator (Apprentice) \nE: labbott@nof.co.uk \nT:+44 (0) 191 375 1639
URL:https://emn.org.uk/oldevent/promoted-event-drax-and-worley-announce-bioenergy-with-carbon-capture-storage-beccs-supplier-roadshow-3/
LOCATION:DoubleTree by Hilton Hull  24 Ferensway  Hull  HU2 8NH
CATEGORIES:Affiliate Member Events
END:VEVENT
BEGIN:VEVENT
DTSTART;TZID=UTC:20220518T100000
DTEND;TZID=UTC:20220518T150000
DTSTAMP:20260406T164731
CREATED:20220407T110207Z
LAST-MODIFIED:20220407T110207Z
UID:3717-1652868000-1652886000@emn.org.uk
SUMMARY:Promoted Event: Drax and Worley Announce Bioenergy with Carbon Capture & Storage (BECCS) Supplier Roadshow
DESCRIPTION:https://www.eventbrite.co.uk/e/drax-and-worley-beccs-roadshow-teesside-tickets-309400564417\nSupplier registration and portal now open\nFollowing on from a successful introductory webinar in September 2021\, which can be viewed here\, renewable energy company Drax is continuing a programme of supplier engagement to help deliver its pioneering bioenergy with carbon capture and storage (BECCS) project in the Humber. BECCS is a climate-saving negative emissions technology that will be critical to helping the UK reach net zero while putting the Humber region at the heart of a global green economy. \nDrax are inviting new and prospective suppliers to attend one of two roadshow events across the Humber and Teesside to learn more about how to get involved with BECCS at Drax. The roadshow events will be co-hosted by Drax and our FEED partners\, Worley. Suppliers hoping to work on the project will have the opportunity to discuss detailed plans for construction of BECCS at Drax with Drax and Worley engineers and submit a formal expression of interest for the project via the supplier registration portal\, Requis. Click here \n\n\nDrax and Worley launch supplier registration portal\nNew and existing suppliers interested in working on the BECCS at Drax project can now submit a formal expression of interest for the project via the supplier registration portal\, Requis. Click here \n\n\nFAQs\nWhat is Bioenergy with carbon capture and storage (BECCS)?\nBioenergy with carbon capture and storage (BECCS) is a technology that has been developed to remove carbon dioxide (CO2) from the atmosphere. At Drax Power Station we already use biomass sourced from sustainably managed forests to generate electricity\, and we now plan to install BECCS technology to capture the CO2 emitted as part of that energy generation. The process of electricity generation becomes carbon negative\, as more CO2 has been removed from the atmosphere than has been added. The captured CO2 will be transported via pipeline and stored permanently under the seabed of the North Sea by our partners in the East Coast Cluster. \n  \nWhat’s the latest update on the BECCs at Drax Programme?\nThe BECCS at Drax project is one of the most advanced CCS projects under development in the UK and is an anchor project in the East Coast Cluster. Recent developments include: \n  \n\nFirst CCS project in the UK to announce a capture technology licence agreement with Mitsubishi Heavy Industries in June 2021​\nWorley selected as EPC partner in December 2021​\nFEED study commenced January 2022\nDevelopment Consent Order application initiated\, with final submission expected in Q2 2022\n\n  \nI’ve previously signed up through the NOF database\, do I need to register again?\nIf you are a supplier hoping to work on the BECCS at Drax project and have registered for the Drax BECCS supplier database via NOF\, you must also submit a formal expression of interest for the project via supplier registration portal\, Requis. Click here \n\n\nLet’s talk\nLewis Abbott\, Events Administrator (Apprentice) \nE: labbott@nof.co.uk \nT:+44 (0) 191 375 1639
URL:https://emn.org.uk/oldevent/promoted-event-drax-and-worley-announce-bioenergy-with-carbon-capture-storage-beccs-supplier-roadshow-2/
LOCATION:Wynyard Marquee  Wynyard Hall  Stockton-on-Tees  TS22 5NF
CATEGORIES:Affiliate Member Events
END:VEVENT
BEGIN:VEVENT
DTSTART;TZID=UTC:20220519T083000
DTEND;TZID=UTC:20220519T120000
DTSTAMP:20260406T164731
CREATED:20220331T105556Z
LAST-MODIFIED:20220428T143004Z
UID:3684-1652949000-1652961600@emn.org.uk
SUMMARY:Affiliate Event: Back to the Future - Brewin Dolphin Investment Conference
DESCRIPTION:
URL:https://emn.org.uk/oldevent/promoted-event-back-to-the-future-brewin-dolphin-investment-conference/
CATEGORIES:Affiliate Member Events
ATTACH;FMTTYPE=image/jpeg:https://emn.org.uk/wp-content/uploads/2022/03/Thumbnail.jpg
END:VEVENT
BEGIN:VEVENT
DTSTART;TZID=UTC:20220520T080000
DTEND;TZID=UTC:20220520T170000
DTSTAMP:20260406T164731
CREATED:20220520T122555Z
LAST-MODIFIED:20220520T122555Z
UID:3794-1653033600-1653066000@emn.org.uk
SUMMARY:Promoted Event: Capture your site’s energy usage to target 50% cost reduction
DESCRIPTION:https://bit.ly/3LC7XWN \nLearning Outcome: \n\n– As energy prices escalate\, find out more about how you can save energy costs and drive down carbon emissions for your business through Calibrate Analytics  \n\nAbout Calibrate Analytics: \n\nCalibrate Analytics© is an innovative controller that enables businesses to plug in different technologies to predict savings and control energy-using assets to increase the energy-efficiency of the site.  \nIt is aimed at high energy-use businesses needing to reduce their energy costs and lower carbon emissions. \n\nHow it works: \n\n – Monitors and optimises all power usage including renewable assets and site power management  \n – Assesses energy-use and can cleverly adjust usage \n – Analyses the savings that could be made by installing alternative eco-friendly technologies \n – Recommends cost savings from these technologies thanks to a running cost analysis for your site  \n – Provides additional income streams through grid balancing and selling excess energy back to the National Grid \n – Allows remote access to monitor your assets 24/7 \n\nBenefits \n – Allows you to future-proof your business for a better bottom line and less negative impact on the environment. \n – Funding is available for a limited time to SMEs in Newcastle\, North of Tyne and Northumberland from the North of Tyne Innovation Recovery Grant. \n\nAbout our company: \nCalibrate Energy Engineering design\, install and maintain eco-technologies with least Environmental impact\, optimal Engineering performance and the most efficient use of Energy for a better bottom line. \nOur award-winning systems include ground and air source heat pumps\, Combined Heat & Power Systems (CHPs) and solar. \n\nhttps://bit.ly/3LC7XWN
URL:https://emn.org.uk/oldevent/promoted-event-capture-your-sites-energy-usage-to-target-50-cost-reduction/
LOCATION:Rye Hill House and Visitor Center\, Rye Hill House and Visitor Cente\, Newcastle College\, Newcastle upon Tyne\, Durham\, NE4 6JB\, United Kingdom
CATEGORIES:EMN & Partner Events
END:VEVENT
BEGIN:VEVENT
DTSTART;TZID=UTC:20220531T120000
DTEND;TZID=UTC:20220531T150000
DTSTAMP:20260406T164731
CREATED:20211122T091752Z
LAST-MODIFIED:20211122T091752Z
UID:3269-1653998400-1654009200@emn.org.uk
SUMMARY:Member to Member: Affiliate Board Meetings
DESCRIPTION:
URL:https://emn.org.uk/oldevent/member-to-member-affiliate-board-meetings-3/
LOCATION:Zoom
CATEGORIES:Affiliate Member Events
ORGANIZER;CN="Engineering Manufacturing Network.":MAILTO:kaye.collins@cdemn.org.uk
END:VEVENT
END:VCALENDAR